Best Practice Guidelines for Integrated Flood Risk Management Planning and Impact Evaluation

Best Practice Guidelines for Integrated Flood Risk Management Planning and Impact Evaluation

These BPG are meant to provide guidance to policy makers and project planners in executing agencies within the MRC Member Countries and the National Mekong Committees (NMCs), as well as to managers in the MRC Secretariat, engaged in the preparation of Integrated Flood Risk Management (IFRM) strategic directions (choice...

Best Practice Guidelines for Structural Measures and Flood Proofing

Best Practice Guidelines for Structural Measures and Flood Proofing

These Best Practice Guidelines (BPG) are prepared as a checklist of planning, functional requirements, design criteria and specifications of specific flood control structural works including assessment and needed actions to be taken in case of increased flood risk. The BPG for development and design of...

Best Practice Guidelines for Integrated Flood Risk Management in Basin Development Planning

Best Practice Guidelines for Integrated Flood Risk Management in Basin Development Planning

A framework for the development of Best Practice Guidelines for Basin Development Planning (BDP)2 was prepared for the FMMP‐C2. The general objective and specific purpose of the IFRM Guidelines for BDP are to: reduce, overall, the socio‐economic costs of...

Best Practice Guidelines for Integrated Planning and Design of Economically Sound and Environmentally Friendly Roads in the Mekong Floodplains of Cambodia and Viet Nam

Best Practice Guidelines for Integrated Planning and Design of Economically Sound and Environmentally Friendly Roads in the Mekong Floodplains of Cambodia and Viet Nam

During recent decades the regional economic development of the four countries of the Lower Mekong (River) Basin has evolved at a fast pace. Such development goes in parallel with the upgrading and development of roads. For a number of reasons road developments in a floodplain, like the still quite natural Mekong...

Project Development Implementation Plan (ProDIP) Prioritization and Banking

Project Development Implementation Plan (ProDIP) Prioritization and Banking

The Flood Management and Mitigation Programme, Component 2 prepared a long‐list of Flood Management and Mitigation projects for the four riparian countries in the Lower Mekong Basin taking into account i) requirements of the National Mekong Committees and Line Agencies in the respective countries, ii) FMM projects in...