Developed by Khmer Focus

National Consultation Meeting on the First Draft Inception Report for the Core River Monitoring Network (October 18, 2021)

National Consultation Meeting on the First Draft Inception Report for the Core River Monitoring Network (October 18, 2021)

H.E Long Saravuth, Deputy Secretary General of Cambodia National Mekong Committee chaired and lead the national consultation meeting on the first draft inception report for the Core River Monitoring Network and with the participation from relevant line agencies such as Ministry of Water Resources and Meteorology, Ministry of planning, Fishery Administration, Tonle Sap Authority Cambodia National Mekong Committee and national consultants. The objectives of meeting are: 1- Discuss and reach agreement on the Core River Monitoring Network project: objective, methodology, workplan and team; 2- Review and discuss on the first draft Inception Report; and 3- Discuss on the preparation of the audit phase....

Read more...

Water level Bulletin (October 18, 2021)

Water level Bulletin (October 18, 2021)

Water level at Mekong, Tonle Sap and Tonle Bassac hydrological stations on October 18, 2021 and forecasting for the next 5 days....

Read more...

Notification On Water Release Schedule From Sesan 4 Reservoir and Sesan 4A Reservoir to the lower area of Sesan River at 14:00 on October 17, 2021

Notification On Water Release Schedule From Sesan 4 Reservoir and Sesan 4A Reservoir to the lower area of Sesan River at 14:00 on October 17, 2021

Notification On Water Release Schedule From Sesan 4 Reservoir and Sesan 4A Reservoir to the lower area of Sesan River at 14:00 on October 17, 2021, with total released to downstream 4232m3/s....

Read more...

Notification On Water Release Schedule From Sesan 4 Reservoir and Sesan 4A Reservoir to the lower area of Sesan River at 13:30 on October 17, 2021

Notification On Water Release Schedule From Sesan 4 Reservoir and Sesan 4A Reservoir to the lower area of Sesan River at 13:30 on October 17, 2021

Notification On Water Release Schedule From Sesan 4 Reservoir and Sesan 4A Reservoir to the lower area of Sesan River at 13:30 on October 17, 2021, with total released to downstream 3949m3/s....

Read more...

Notification On Water Release Schedule From Sesan 4 Reservoir and Sesan 4A Reservoir to the lower area of Sesan River at 12:30 on October 17, 2021

Notification On Water Release Schedule From Sesan 4 Reservoir and Sesan 4A Reservoir to the lower area of Sesan River at 12:30 on October 17, 2021

Notification On Water Release Schedule From Sesan 4 Reservoir and Sesan 4A Reservoir to the lower area of Sesan River at 12:30 on October 17, 2021, with total released to downstream 3653m3/s....

Read more...