Developed by Khmer Focus

2nd National Consultation Meeting on the Preparation of the National Indicator Plan 2021-2025

2nd National Consultation Meeting on the Preparation of the National Indicator Plan 2021-2025

Kampong Cham: HE Te Navuth, Permanent Vice Chairman of the Cambodia National Mekong Committee (CNMC), chaired the 2nd National Consultation Meeting on the Preparation of the National Indicator Plan 2021-2025 (NIP 2021-2025) at Phnom Pros Hotel, Kampong Cham Province, with the participation of the Secretary General and Deputy Secretary General, officials from CNMC and with the participation of officials representing relevant ministries and institutions, including MOWRAM, MOE, MAFF, MME, MOP, MPWT, MLUC and TSA, a total of 25 participants. The results of the meeting are as follows: - The meeting discussed and suggested some of the projects available at the national level with funding about $ 13 million to be included in NIP 2021-2025 - Floods and Droughts are very important, but now the focus is on drought, so Cambodia should pay attention to this issue - Meeting proposes to add existing projects to NIP 2021-2025, in particular CNMC projects include CNMC-NIS...

Read more...

Water level Bulletin (June 07, 2021)

Water level Bulletin (June 07, 2021)

Water level at Mekong, Tonle Sap and Tonle Bassac hydrological stations on June 07, 2021 and forecasting for the next 5 days....

Read more...

Water level Bulletin (June 06, 2021)

Water level Bulletin (June 06, 2021)

Water level at Mekong, Tonle Sap and Tonle Bassac hydrological stations on June 06, 2021 and forecasting for the next 5 days....

Read more...

Maintenance Of The Mekong-HYCOS Stations (June 05, 2021)

Maintenance Of The Mekong-HYCOS Stations (June 05, 2021)

From May 28 to June 6, 2021, Mr. Chheang Hong, Coordinator for Technical Support Division of Information and Knowledge Management Department of Cambodia National Mekong River Commission; is facilitating the Technical Working Group. from the Department of Hydrology and River Works of MOWRAM and expert from the MRC Secretariat to review and have a maintenance of the Mekong-HYCOS stations along the Mekong River in provinces of Cambodia. As a result, the Mission Team are (1) evaluating the condition of each station to prepare a technical report and make recommendations for the next year’s plan; (2) repairing the old spare parts that are no longer working, problematic and expired; (3) cleaning the perimeter and the rain filter; (4) connecting and reactivating the network so that the system can work properly to ensure transmitting of data to the main sever for the sake of managing the Mekong River Basin and (5) strengthening the capacity of the National team and stations'...

Read more...

Water level Bulletin (June 05, 2021)

Water level Bulletin (June 05, 2021)

Water level at Mekong, Tonle Sap and Tonle Bassac hydrological stations on June 05, 2021 and forecasting for the next 5 days....

Read more...